Search:
   
      Enter Location:
     Select Mode:
  
Turnkey Projects >> MAJOR BREAK THROUGH
  

At ABC INDIA LIMITED, we have completed some prestigious assignments, which were not only challenging and dramatic in nature, but also required specialized knowledge in diverse subjects and appropriate infrastructure.

      

Moving a package weighing 450 MT over a distance of 70  Km, the heaviest single  package transported on Indian soil ever
 

Moving 8 Heavy Lifts of  nearly 100 MT each from Kolkata to Agartala (Tripura) by River cum Road service using Indo-Bangladesh river corridor for the first time in the country.
 

Moving and erecting a gigantic monolithic statue of Lord Buddha, the tallest in the world weighing 320 MT, in the middle of Hussain Sagar Lake, Hyderabad.
 

Transporting a Heavy Drum weighing 140 MT using the Lattice Girder Mechanism from Vizag Port to Bhadrachalam using bridges over the River Godavari having multiple spans of  20 X 45.75 meters and 48 X 43.70 meters.
 

Transporting a 250 MT Boiler from Kolkata Port to Farakka by barge on a sub-channel of the River Ganges and offloading the same for movement to site through RORO Jetty, constructed for this operation.
 

Transporting Heavy Lifts weighing upto 126 MT in Colombo, Sri Lanka using our own equipment.
 

Transporting heaviest Package weighing 197.5 MT with dimension of 13.60m X 7.52m X 7.70m at Haldia with dimensions.
   

Transporting 6 packages 180 and 197 MT using 96 Hydraulic Axles in a convoy from Kandla (Gujrat) to Anta (Rajasthan).

    

Site Map | ABC Corporate | Quality Control | Social Responsibility | Publications | Industry | Careers | Disclaimer
                   
Copyright©2002 ABC INDIA LIMITED. All rights reserved